Who should attend?

This course is designed for anyone who needs to use Asta Powerproject within the NEC3 contract.

Please note: the course does not cover how the contract should be implemented but is focussed on the way in which the Asta Powerproject software satisfies the contract requirements.

Course objectives

Through the use of specific exercises and examples, the delegates will gain an understanding of Asta Powerproject that will satisfy the programme requirements of clause 31.2, clause 32.1 and compensation events in core clause 60.1 within the NEC3 contract. Those attending should be familiar with Asta Powerproject and ideally should have attended the Introduction to Asta Powerproject course.

Topics include

  • Understanding linking, float and critical path
  • Working with ‘terminal float’
  • Dealing with time risk allowance
  • Baselines
  • Dealing with compensation events
  • Showing cost implications on prelims as a result of compensation events

Training Course Dates

For course availability, location and dates please view the Training Calendar or call 01844 261700 or email training@elecosoft.com.

For pricing and to book please call 01844 261700 or email training@elecosoft.com.

Courses are held at our Training Centre in Haddenham, Buckinghamshire; at regional locations throughout the UK; or at your own premises.

Need a fully customised training course?

We can run training courses that are customised to your specific requirements. The Asta Powerproject training can be based on your own templates and the course notes tailored to reflect the way you run projects. Contact our Training Department now on 01844 261700 or email training@elecosoft.com.