Shepherd Construction’s award-winning work on The Pirbright Institute’s 120m BBSRC National Virology Centre, was achieved using Asta Powerproject Enterprise. Enterprise was used to enable the high degree of integration and collaboration between different disciplines and specialist teams from the group that was essential to create a building that meets the world’s most advanced category for biohazard containment facilities. The resulting structure exceeded the building regulations for air tightness and was delivered on time and budget despite many challenges. Rob Rushworth, Lead Planner said: “We chose Asta Powerproject enterprise because of its multi-user capabilities – it meant that my team of four could all work simultaneously on the programme and without this it would have required additional people to do the job”